Bluemels-Garden-and-landscape-center Bluemel-s

Quality & Service are the Roots of Our Business.

Greenfield, Wisconsin

4930 W. LOOMIS RD.

(414) 282-4220

Facebook circle black large Twitter circle black large Pinterest circle black large youtube-4-xxl Google + circle black large linkedin Blum-Logo

CARING FOR YOUR NEW SOD

Bluemels_Logo_CMYK_small

Watering your new sod after it has been installed is very critical. Regular watering is necessary until the root system has become deeply established, usually one full summer, but up to 2 full summers where soil is heavy clay or compacted.

 

For example, sod that is laid in August should be given frequent shallow watering during the hot weeks of August and September, then watering can be reduced as the weather cools. However, because the root system is not completely established, a careful watering program should begin again the next spring, and should continue through the hot months. Failure to do so could result in a burned lawn when the temperatures reach 80 degrees.

THEN YOU'LL LIKE BEING AN INSIDER.

LIKE INFO LIKE THIS?

Join today!

JOIN THE CLUB

For the initial watering, 1/2" of water at each watering will soak the sod adequately. In later weeks, as the watering frequency decreases, 1" should be applied at each watering. To determine how long to run your sprinkler, use a small can with low sides placed in the sod to measure the water (a tuna can works well).

 

Allow sod to grow 4"-5" before mowing. Mow no shorter than 3".

 

September fertilizing is recommended for new sod, however, do not fertilize for the first 60 days after is laid. For sod laid down in fall, fertilize in May.

Follow these steps and you're on your way to having a successful, newly sodded lawn!

Bluemels_Logo_CMYK_small Bluemels_Logo_CMYK_small